Terms & Condition for Building Control Processes

Completion Certificate / Revisit for Completion Certificate

  1. Confirmation of application receiving will be given immediately via Email & SMS.
  2. Application along with attached documents will be Scrutinized in 3 x working days and applicants will be intimated via Email or WhatsApp.
  3. Completion applications will be processed in 20 x working days after Scrutiny.
  4. Applicants will bring 2 x Set of Approved Drawings or copies (Ammonia Prints) at the time of receiving Completion Certificates. (If changes / deviations have been made from approved drawing, applicants must provide revised drawing to regularize the construction on intimation of BC staff)
  5. On receipt of application, DHA field staff will inspect the house / building to ascertain factual position and incase of deviations, observations will be communicated to applicants via Email, WhatsApp and letter.
  6. If completion certificate is not obtained within the Prescribed period, members shall have to pay Fine as decided by the Authority.
  7. Completion Certificate will only be handed over to Owner of the building or DHA Special Power of Attorney Holder. (original CNIC is required for receiving)

Opening of Water Sewer Connection / Revisit for Water Sewer Connection

  1. Confirmation of application receiving will be given immediately via Email & SMS.
  2. Application along with attached documents will be Scrutinized in 3 x working days and applicants will be intimated via Email or WhatsApp.
  3. Water-sewer request will be processed in 20 x working days after Scrutiny.
  4. On receipt of application, DHA field staff will inspect your house / building to ascertain factual position and incase of deviations, observations will be communicated to you via Email and Letter.
  5. After site visit by the field staff of building control branch and satisfactory construction as per approved drawing with no construction violations, recommendation for opening of both the connections is made.
  6. Water-sewer connection will be provided after flooring, plastering, gate, doors, windows, electrification and plumbing of the house / building are ready in all aspects.
  7. In case of 10KW or above Solar System installed, attach a copy of bill from some renowned Solar System provider company on their letter head showing purchase and installation date of the system. (For houses measuring 1 Kanal & Above) – If applicable.
For any inquiries, please do not hesitate to contact at [email protected]